Home Industries Platform Nx·Studio Flagship Nx IDE Cognitive Engine Trust Center Pricing Capabilities About Us Leadership Team Careers Contact Us
Automation delivered as source code

Automate routine operations on software your organization owns.

Digital Worker 8 AI Agents Active

Enterprise SAP Archiving Intelligence Platform

An 8-agent AI orchestration platform performs comprehensive SAP data lifecycle analysis. Agents scan database structures, develop archiving strategies (conservative/balanced/aggressive), map dependencies, validate compliance, calculate financial ROI, assess risks with mitigations, ensure data quality, and provide human-in-the-loop approval gates for safe execution.

Problem Statement

The challenge addressed

SAP systems accumulate massive data volumes causing performance degradation, storage costs escalation, and compliance risks. Manual archiving analysis is slow, risky, and often incomplete—missing dependencies, violating retention policies, or creatin...

Solution Architecture

AI orchestration approach

An 8-agent AI orchestration platform performs comprehensive SAP data lifecycle analysis. Agents scan database structures, develop archiving strategies (conservative/balanced/aggressive), map dependencies, validate compliance, calculate financial ROI,...
Interface Preview 4 screenshots

SAP Configuration & Agent Fleet - 7 specialized AI agents with performance scores and SAP system connection settings

AI Analysis in Progress - Deep analysis with agent reasoning, real-time collaboration panel, and tool execution tracking

Archiving Intelligence Report - Analysis overview with database reduction metrics, annual savings, and balanced wave strategy

SAP Archiving Business Case - Executive ROI summary with investment analysis, risk assessment, and implementation timeline

Multi-Agent Orchestration

AI Agents

Specialized autonomous agents working in coordination

8 Agents
Parallel Execution
AI Agent

Chief Coordinator Agent

Complex SAP archiving analysis requires coordinating multiple specialized agents, managing workflow dependencies, handling human approvals, and synthesizing results into cohesive recommendations.

Core Logic

The Orchestrator manages entire workflow execution, coordinates task distribution across agents, enforces quality assurance gates, synthesizes analysis results, handles human intervention requests, builds consensus among agents on complex decisions, manages SLA deadlines, and maintains complete audit trails for regulatory compliance.

ACTIVE #1
View Agent
AI Agent

Database Analyst Agent

SAP databases contain thousands of tables across multiple modules with unknown sizes, growth patterns, and age distributions, making archiving candidate identification difficult.

Core Logic

DataDiscovery scans SAP databases to enumerate tables by module (MM, FI/CO, HR, SD). It calculates table sizes (GB/TB), record counts, monthly/yearly growth trends, and age distribution (<1yr, 1-3yr, 3-5yr, >5yr). It assesses data quality (completeness, consistency, accuracy, timeliness), identifies archiving objects, and detects patterns for optimization.

ACTIVE #2
View Agent
AI Agent

Strategy Planner Agent

Archiving requires balanced strategies that maximize data reduction while minimizing risk, but determining optimal approaches, timing, and implementation waves requires complex trade-off analysis.

Core Logic

ArchiveStrategist designs archiving strategies (conservative/balanced/aggressive) with implementation wave planning. It prioritizes objects by impact and risk, creates execution timelines, calculates safety scores, determines total reduction potential and cost savings, and plans wave-by-wave execution with risk/reward optimization.

ACTIVE #3
View Agent
AI Agent

Relationship Analyst Agent

SAP tables have complex parent-child relationships, reference constraints, and custom code dependencies. Archiving without understanding these dependencies causes data integrity failures and broken processes.

Core Logic

DependencyMapper constructs dependency graphs mapping parent-child relationships, reference constraints, and cascade requirements. It detects orphan records, identifies circular dependencies, tracks custom code references, analyzes deletion impact, and determines safe archiving sequences. Output includes dependency maps with risk flags.

ACTIVE #4
View Agent
AI Agent

Regulatory Expert Agent

Data archiving must comply with multiple regulations (SOX, GDPR, tax laws, industry-specific requirements) with varying retention periods, audit trail requirements, and approval processes.

Core Logic

ComplianceGuardian validates archiving strategies against retention period requirements, identifies applicable regulations per data type, assesses audit trail requirements, analyzes data privacy impacts, determines approval needs, identifies compliance gaps, and creates remediation plans with regulatory timelines.

ACTIVE #5
View Agent
AI Agent

ROI Calculator Agent

Archiving projects require compelling business cases with accurate cost estimates, savings projections, and ROI calculations to secure executive approval and budget allocation.

Core Logic

FinancialAnalyst calculates total investment (upfront + recurring), annual savings (storage, licensing, performance), NPV, ROI percentage, and payback period. It performs sensitivity analysis across multiple scenarios, generates year-by-year projections, and documents assumptions. Output builds the financial case for executive decision-making.

ACTIVE #6
View Agent
AI Agent

Risk Analyst Agent

Archiving projects carry risks across multiple domains—data loss, compliance violations, performance degradation, business continuity—requiring systematic identification, quantification, and mitigation planning.

Core Logic

RiskAssessor identifies risks across key categories (data loss, compliance, performance, business continuity), assesses likelihood and impact, calculates risk scores, generates mitigation strategies with owner assignments, tracks mitigation effectiveness, and determines risk acceptance thresholds. Output includes overall risk level and complete risk register.

ACTIVE #7
View Agent
AI Agent

Quality Assurance Agent

Archiving poor-quality data wastes resources and may violate retention requirements. Quality issues must be identified and remediated before archiving proceeds.

Core Logic

QualityValidator assesses data quality across dimensions (completeness, accuracy, consistency, timeliness), executes validation rules, identifies quality issues, generates quality scores, makes gate pass/fail decisions, and creates remediation action plans. It can block archiving if quality thresholds are not met.

ACTIVE #8
View Agent
Technical Details

Worker Overview

Technical specifications, architecture, and interface preview

System Overview

Technical documentation

ArchiveIQ is a production-grade AI agent orchestration platform for SAP data archiving strategy development. Eight specialized agents analyze database structures, dependencies, compliance requirements, financial projections, and risks. The platform includes real-time cost tracking, human-in-the-loop interventions, live telemetry, multi-agent consensus, and agent self-reflection capabilities.

Tech Stack

6 technologies

SAP system connectivity (ECC, S/4HANA, BW, CRM)

Database analysis tools for table scanning and sizing

Compliance rules engine for SOX, GDPR, and tax retention

Financial modeling engine for NPV and ROI calculations

Frontend with real-time telemetry dashboard

Human-in-the-loop approval workflow integration

Architecture Diagram

System flow visualization

Enterprise SAP Archiving Intelligence Platform Architecture
100%
Rendering diagram...
Scroll to zoom • Drag to pan